Today, the Fergana Polytechnic Institute is carrying out large-scale work on the implementation of the tasks set by the President. In particular, the student of the institute, Abdulvasit Khairullayev, created a 1-5 kW low rotation wind generator.
The project "Collection and technical modeling of the wind generator model" was prepared and put into practice by the unitary enterprise "FERPI-INNO" with a total cost of 33 million soums.
Currently, this generator is working at full capacity and is producing 5 kW of electricity.
